EGYPT |
OFMECO Pressure Com-ponents Srl |
2016 |
Ain Sokhna Super Critical Power Plant (2X650) MW |
Deaerator Thermal Design Improvement, High Pressure Heater Inspection Unit 1& 2 |
EGYPT |
OFMECO Pressure Com-ponents Srl |
2016 |
Ain Sokhna Super Critical Power Plant (2X650) MW |
High Pressure Heaters Inspection & Repair Unit 1 |
EGYPT |
Egyptian Marketing Consul-tants (EMC) |
2015 |
Assuit El-Waledia Steam Power Plant 2x320MW |
Detail Engineering, Installing, Commissioning and Start Up New Hydrogen Generating Plant |
EGYPT |
TBEA Shenyang Transfor-mer Group Co., LTD |
2015 |
Giza North Power Plant CP-113 Combined Cycle Power Plants 2250MW |
Designing, Supplying and Instal-ling Transformer Radiator Support |
EGYPT |
GE / TSK / Hassan Allam Construction |
2015 |
14 Gas Turbine LM6000 at three sites Hurgada , Sharm Elshiekh and port said |
Installing , testing and pre commissioning of Qty. (14) Gas turbine LM6000 complete power block |
EGYPT |
Egyptian Marketing Consultants (EMC) / EDEPC |
2015 |
Abu Sultan Power Plant (4x150)MW Unit 3 |
Mechanical and Electrical construction for Feed Water Pumps Replacement in Unit One. |
EGYPT |
El-Nubaria – Mohamed Ragab Farm |
2014 |
Deep well Pump 9 kW |
Supply and Install Solar Water Pump System 9.4 kWp. |
EGYPT |
West Delta Electricity Production Company (WDEPC) |
2014-2015 |
WDEPC Building in Gelim & Sidi Krir PP Administration Building |
Supply and Install
105 kWp Grid Tie Solar Photovoltaic Roof System
|
EGYPT |
Egyptian Marketing Consultants (EMC) / WDEPC |
2014-2015 |
Abu Qir Power Plant / Unit Five 300 MW |
Conducting the Dismantling, Supplying, Installation and Pressure Test Activities for High Pressure Heaters no. 6 & 7 |
EGYPT |
Egyptian Marketing Consultants (EMC) / EDEPC |
2014-2015 |
Auon Mousa Steam Power Plant (2x350)MW / Unit Two |
Conducting the Dismantling, Supplying, Installation and Pressure Test Activities for High Pressure Heater no. 6 Coils |
EGYPT |
Egyptian Marketing Consultants (EMC) / EDEPC |
2014 |
Abu Sultan Power Plant (4x150)MW, Unit 1 |
Mechanical and Electrical construction for Feed Water Pumps Replacement in Unit Three |
EGYPT |
Egypt Engineering Services Co. S.A.E. (EGYPTROL) |
2014 |
Egyptrol Roof Solar System |
Supplying and Installing
3 kW Solar Photovoltaic Grid Tie Roof System
|
EGYPT |
TTC/TPSC |
2014 |
Sidi Krir Combined Cycle Power Plant 750MW /
CP-118
|
Dismantling, Supplying and Installing Five spools in WS system |
EGYPT |
ERCC - Kafr El-Sheikh - Abu Riad Village – Omar ElWeshy Farm |
2014 |
Farm Fish - Surface Pump 2.5 kW |
Supplying and Installing Solar Water Pump System 3.5 kWp |
EGYPT |
Egyptian Electricity Transmission Company EETC / Upper Egypt Electricity UEE |
2013 |
Supplying Fire Fighting Equipments to Upper Egypt Electricity - Aswan Networks Sector Buildings |
Supplying Fire Fighting Extinguishers and Out Doors Fire Hose Cabinets |
EGYPT |
EMC / EDEPC |
2013 |
Attaka Power Plant (2x150+2X320)MW |
Erection two (2) Self Cleaning Filters on Closed Cooling Heat Exchangers and Supplying the Mechanical Items |
EGYPT |
Egyptian Electric Utility and Consumer Protection Regulatory Agency (ERA) |
2013 |
ERA Roof Solar System |
Supplying and Installing 12.5 Kw photo voltaic system |
EGYPT |
Abu Zaabal Fertilizers and Chemicals Company (AZFC) |
2013 |
Unit Seven 15MW Steam Turbine Generator |
Conducting the Operation and Preventive/ Corrective Maintenance |
EGYPT |
East Delta Electricity Production Company (EDEPC) |
2013 |
Attaka Power Plant (2x150+2X320)MW |
Supply and Install Charging Headers for 250 Bar H2 Cylinders in H2 Generation Unit |
EGYPT |
Tourah Cement Factory |
2011 |
Tourah Cement Factory |
Electrical work for replacing Packing Plant no. 3 |
EGYPT |
EMC / EDEPC |
2012 |
Abu Sultan Power Plant (4x150)MW |
Erection, Commissioning and Start–up for new Hydrogen generating plant & Supplying all the Electrical material |
EGYPT |
EMC / EDEPC |
2012 |
Attaka Power Plant (2x150+2X320)MW |
Erection, Commissioning and Start–up for new Hydrogen generating plant & Supplying all the Electrical material |
EGYPT |
EMC / EDEPC |
2012 |
Abu Sultan Power Plant (4x150)MW, Unit 4 |
Mechanical and Electrical works for the replacement of 3 Feed Water Pumps |