Country | Client | Year | Project | Scope Details |
---|---|---|---|---|
EGYPT | Airliquide | 2016 | JUSHI Sokhna VSA Project | Piping, Mechanical and Electrical Engineering services for VSA GOX, LOX & GOX Backup, cooling water, seal water and FF systems |
EGYPT | Siemens / BUREAU VERITAS | 2015-2016 | 4x4800MW CCPP for New Capital (Cairo), Burullus and Beni Suef | Consultancy Services |
EGYPT | EMC (Egyptian Marketing Consultants) | 2015-2016 | EGYPT - Farafra Diesel Power Station 4 X 4 MW - MAN Gensets | - Preparation of P&ID's "Using Intelligent Plant 3D software" for 6 systems (Fuel Oil, Lube Oil, Compressed Air, Sludge, Exhaust & Cooling Water) - Preparation of 3D Model "Using Intelligent Plant 3D software" for 6 systems (Fuel Oil, Lube Oil, Compressed Air, Sludge, Exhaust & Cooling Water) - Issuing Bill of Quantities "BOQ's" & Technical Specifications - Issuing Isometrics & Fabrication Drawings - Issuing Steel Supports and Trenches Design Drawing - Issuing Structure Analysis Calculation Reports for Steel Supports |
EGYPT | EMC (Egyptian Marketing Consultants) / PowerServ | 2015 | Assuit Elwalidia Thermal Power Plant 2 X 300 MW - H2 Plant Replacement Project | - Preparation of 3D Model "Using Intelligent Plant 3D software" encompassing old network and new network showing the overlaps - Issuing Bill of Quantities "BOQ's" for piping, fittings & valves |
EGYPT | Cairo Electricity Production Company | 2015 | Shubra ElkheimaThermal Power plant (4 x 330) MW - Replacement & Rehabilitation of the Fire Fighting Network | - Site Surveying & inspection as well as studying different options for pipe routing - Preparation of 3D Model "Using Intelligent Plant 3D software" encompassing old network and new network showing the overlaps - Issuing Bill of Quantities "BOQ's", Technical Specifications & Tender Package - Issuing Isometrics & Fabrication Drawings - Issuing Steel Supports and Trenches Design Drawing. - Issuing Structure Analysis Calculation Reports for Steel Supports |
EGYPT | Arab Contractors | 2014-2015 | 750MW Alshabab and West Damietta Conversion Power Project | Support Arab Contractor during tender stage by preparing BOQ's, calculation reports, design drawings and execution procedures for the civil & electromechanical scope of CP-102 Civil package. |
EGYPT | Hang Zhou Boilers | 2014-2015 | 750MW Alshabab and West Damietta Conversion Power Project | Support Hang Zhou OEM during tender stage by reviewing proposal technical documents, drawings and execution procedures for CP-105 HRSG package. |
EGYPT | Aquatech / EMC | 2014-2015 | 3x650MW South Helwan Supercritical Thermal Power Plant | Support Aquatech during tender stage by preparing civil conceptual and Detail design, BOQ's , Procurement Management for CP-111 Water Treatment package |
EGYPT | KSB Pumps / EMC (Egyptian Marketing Consultants) / PowerServ | 2014-2015-2016 | Abu Sultan Power Pant 4 X 150 MW - Replacement of feed water pumps of Unit 1, 3 and 4 | - Site Surveying & inspection as well as studying different options for pipe routing - Stress Analysis Using Caesar intelligent Software for the Suction Lines - Issuing Bill of Quantities "BOQ's" - Issuing Isometrics & Fabrication Drawings - Issuing As Built Drawings |
IRAQ | Mantrac / Caterpillar | 2014-2015 | American Embassy in IRAQ - 20 MW Diesel Power Plant | - Preparation of 3D Model "Using Intelligent PLANT 3D software" for the Mechanical Systems - Issuing Plan, elevation and sectional views drawings - Issuing Bill of Quantities "BOQ's" - Issuing Isometrics & Fabrication Drawings - Issuing As Built Drawings |
EGYPT | Tam Environmental Services | 2014 | Remela RO plant | Detailed Engineering for all electromechanical services |
EGYPT | Tam Environmental Services | 2014 | Sheikh Zuwaid RO plant | Detailed Engineering for all electromechanical services |
EGYPT | Arab Contractors | 2013 | 3x650MW South Helwan Supercritical Thermal Power Plant | Support Arab Contractor during tender stage by preparing BOQ and execution procedures for CP-102 Civil package. |
EGYPT | Hassan Allam Sons | 2013 | 3x650MW South Helwan Supercritical Thermal Power Plant | Providing technical support in the preparation of bid documents to HAC for CP-105 HRSG package. |
EGYPT | TAQA | 2013 | 7x1MVA+1x.5MVA DG power plant, Marsa Alam | Study for efficiency improvement. |
EGYPT | Tam Environmental Services | 2013 | Saloum RO plant | Detailed Engineering for all electromechanical services |
EGYPT | Tam Environmental Services | 2013 | Sahl Hashish RO plant | Detailed Engineering for all electromechanical services |
EGYPT | Tam Environmental Services | 2013 | Sidi Barani RO plant | Detailed Engineering for all electromechanical services |
EGYPT | Arab Contractors | 2014-2015 | 750MW Alshabab and West Damietta Conversion Power Project | Support Arab Contractor during tender stage by preparing BOQ's, calculation reports, design drawings and execution procedures for the civil & electromechanical scope of CP-102 Civil package. |
EGYPT | Hang Zhou Boilers | 2014-2015 | 750MW Alshabab and West Damietta Conversion Power Project | Support Hang Zhou OEM during tender stage by reviewing proposal technical documents, drawings and execution procedures for CP-105 HRSG package. |
NIGERIA | ORASCOM Construction Industries | 2012 | Azura, Nigeria. 500 MW (4x125MW) Gas Turbine Simple Cycle Power Plant. | Prepare Technical Proposal contents Preliminary BOQ’s Cost Estimate |
IRAQ | Arab Contractors / El-Sewedy Power | 2012 | Samawa, Iraq. 500 MW (4x125MW) Gas Turbine Simple Cycle Power Plant. | Prepare Technical Proposal contents Preliminary BOQ’s Cost Estimate |
IRAQ | Arab Contractors / El-Sewedy Power | 2012 | Diwania, Iraq. 500 MW (4x125MW) Gas Turbine Simple Cycle Power Plant | Prepare Technical Proposal contents Preliminary BOQ’s Cost Estimate |
MAURITANIA | ORASCOM Construction Industries | 2012 | Nouakchott, Mauritania. 120MW (8x15 MW) Diesel Power Plant | Prepare Technical Proposal contents and Cost Estimate |
EGYPT | Roots Steel Systems | 2012 | Pre-Engineered Steel Factory | Preparation of electromechanical systems Contractor Packages and Construction Management |
EGYPT | Tam Environmental Services | 2012 | Al Montazah MBR plant | Detailed Engineering for all electromechanical services |
EGYPT | Tam Environmental Services | 2012 | Taba Water RO plant | Detailed Engineering for all electromechanical services |
EGYPT | Tam Environmental Services | 2011-2012 | Matrouh city water RO desalination plant | Electromechanical systems detailed engineering and construction management |
SYRIA | Socoin | 2011 | Dir Ali II, 1x750 MW CCPP | Sub-Consultant to Gas & ST. Turbine: ANSALDO HRSG : NEM |
EGYPT | Kharafi National | 2011 | 5X8MW Diesel Generators Power Plant | Preliminary Design for civil, mechanical, electrical and control systems |
EGYPT | Kharafi National | 2011 | W. Damietta –4X125MW SCPP | Pipe lines hydraulic calculations, for all auxiliary systems (water and fuel) |
EGYPT | HYOSUNG CORPORATION | 2011 | Damietta - 4x125MW SCPP,220KV GIS Substation of Power Station | - Relays setting Calculations - Construction supervision |
KSA | VECG | 2011 | El-Haram Power Generation Plant El-Madeinah El-Monawara | Mechanical systems shop drawings |
EGYPT | Kharafi National | 2011 | - Damietta - 4x125MW SCPP - Elshabab - 8x125MW SCPP |
- Firefighting, water systems and fuel oil system - Pipe lines Hydraulic calculations & P&ID review) |
EGYPT | Electro Tharwat | 2010 | Al-Gabal Al-Asfar & Cairo - Alex & EL-Haramain railways projects | Tender document study and determination of BOQ. |
EGYPT | Egyptian Canadian Pharmaceuticals ECAN Pharmaceuticals | 2009-2010 | With: Egypt. Comp. for Complementary Works ECC Facility – El Obour City, Cairo, Egypt. | Preparation of Electrical, Fire Fighting and plumbing systems Contractor Package |
EGYPT | Airliquide | 2009 | Industrial Gases Production Plant at the 6th of October City | Design Cooling System Logic Diagrams |
EGYPT | PGESCo | 2009 | Design for New Transformer Factory – Badr City for ELMACO | Steel Structure Design as a sub-consultant to PGESCo |
EGYPT | AUG Pharmaceuticals | 2008-2012 | AUG Pharmaceuticals Facility – 6th of October City, Cairo, Egypt | Preparation of electromechanical systems Contractor Packages and Construction Management |
EGYPT | Global Partners – INITEC. | 2008 | El-Kuraimat (III) Power Plant Project CP-105 & CP-106 Scope | Grounding System Design and BOQ within INITEC scope of supply |
EGYPT | Global Partners – INITEC. | 2008 | El-Tebbin Power Plant Project CP-106 & CP-118 Scope | Grounding System Design and BOQ within INITEC scope of supply |
EGYPT | Global Partners – INITEC. | 2008 | Nubaria (III) Power Plant Project CP-106, CP-117 & CP-118 Scope | Grounding System Design and BOQ within INITEC scope of supply |
EGYPT | GlaxoSmithKline | 2005-2006 | Madinet El Salam Manufacturing Facility | Consultation Services for Survey for Factory Electrical System as built drawings preparation |
EGYPT | US Filters “Egyptian European Pharmaceutical Co.” | 2001 | Water Treatment Plant | Piping And Isometric Design |
EGYPT | Hi-Tec Pioneers “Egyptian Ministry Of Irrigation and Water Resources” | 2000-2002 | Bahr Tanah (Mansoura) Irrigation System levels control | Control system design |
EGYPT | US Filters | 1998-2001 | Water and Waste Water Treatments for many projects | Mechanical and Piping Isometrics Design. Main Electrical and Control Panel design |
EGYPT | Ministry of Electricity –New & Renewable Energy Authority | 2000 | Experimental 15kW Wind Turbine Generation Unit | Control system design |
EGYPT | Qarun Petroleum Co. | 2000 | Oil Receiving Station | P&ID Drawings |